Find Jobs
Hire Freelancers

Mineral Processing Pre-Feasibility Study (Iron/Aluminium)

$20000-50000 USD

Cerrado
Publicado hace más de 1 año

$20000-50000 USD

Pagado a la entrega
We’re anticipating the Viability Study will be a high-level study of a mineral processing zone (MPZ) in the Republic of Congo (ROC) over a few months seeking to: • Ascertain whether it is better to establish the proposed iron-ore MPZ, primarily pig iron plant at the mine, or 400km away at the deep-water port at Pointe-Noire • Can the MPZ be serviced with sufficient infrastructure at the mine? • ROM of capex and opex for MPZ (note, 2 nearby hydro schemes are about to commence construction totalling 300MW that could be partially harnessed to power the MPZ) • ROM of capex and opex for MPZ at Pointe-Noire, adjacent to the port. Power supply here would be derived from gas, albeit, development of the ROC’s significant proven gas reserves is very much in its infancy • ROM of capex and opex for an aluminium smelter or integrated smelter/refinery MPZ at Pointe-Noire • High-level technical and commercial assessment as to whether any one or more of the MPZ options are potentially viable. If there is potential viability, then the final step would be to outline the Terms of Reference for a Pre-Feasibility Study for the relevant MPZ development(s). Background: Rather than starting with a PFS from the get-go, we recommend we do a viability assessment first, to see whether it is worth considering such developments. We are broadly defining the study / design gateways as: Viability Study • Primary focus: Why consider the development? • Vision planning of broad options • Rough order of magnitude (ROM) costs +100%/-50% Pre-Feasibility Study • Primary focus: What is the development? • Master planning resolution of 1 or 2 preferred options • CAPEX +/-50% and indicative OPEX Bankable Feasibility Study • Primary focus: How to implement development? Concept design • CAPEX / OPEX +/-30% FEED / Preliminary Design • CAPEX / OPEX +/-20% EPIC / Detailed Design • CAPEX / OPEX +/-10%
ID del proyecto: 35326064

Información sobre el proyecto

5 propuestas
Proyecto remoto
Activo hace 1 año

¿Buscas ganar dinero?

Beneficios de presentar ofertas en Freelancer

Fija tu plazo y presupuesto
Cobra por tu trabajo
Describe tu propuesta
Es gratis registrarse y presentar ofertas en los trabajos
5 freelancers están ofertando un promedio de $34.700 USD por este trabajo
Avatar del usuario
Hi, I am a mining and mineral processing expert, working with various metals in research and plant construction. In formal education, I have my Master's degree in Chemical Environmental engineering from Columbia University. Are you looking for a AACE concept screening estimate, a mining plan, or a economic viability study? What phase in the project are you currently standing in?
$50.000 USD en 90 días
5,0 (3 comentarios)
4,3
4,3
Avatar del usuario
Hi there
$28.500 USD en 7 días
5,0 (1 comentario)
2,3
2,3
Avatar del usuario
Hi, Hope you are doing well. We are much expertise group of iOS, Android, Website developers and Designers Please review my profile - https://www.freelancer.in/u/rijutapatidar I understood the initial scope of Mineral Processing Pre-Feasibility Study (Iron/Aluminium). I want to discuss more about this project in order to prepare the final concept. So let’s discuss in detail over chat then we will make a plan to start work on it. Thanks
$35.000 USD en 70 días
0,0 (0 comentarios)
0,0
0,0

Sobre este cliente

Bandera de UNITED ARAB EMIRATES
Abu Dhabi, United Arab Emirates
0,0
0
Miembro desde nov 25, 2022

Verificación del cliente

¡Gracias! Te hemos enviado un enlace para reclamar tu crédito gratuito.
Algo salió mal al enviar tu correo electrónico. Por favor, intenta de nuevo.
Usuarios registrados Total de empleos publicados
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
Cargando visualización previa
Permiso concedido para Geolocalización.
Tu sesión de acceso ha expirado y has sido desconectado. Por favor, inica sesión nuevamente.