Basically, There are 3 types of buildings:
1. The hotel: 9,240 m2 x 14 Floors + 3 basements floors
2. The Cinema Building: 3,000 m2 x 5 Floors
3. Mall Buildings: 3,000 m2 x 2 floors x 20 Buildings
If you did the analysis and computations for 1 floor in the mall buildings, you will multiply it by 2 for the same building and by 20 for the other buildings. For the Cinema building, you will multiply it by 5. This is because all these buildings have the same area and height.
For AC (HVAC): Consider the following volumes:
Hotel: 9,240 m2 x 15 floors = 730,000 m3
Cinema Building: 3,000 m2 x 5 floors x 6 m (height) = 90,000 m3
20 buildings. each building 3,000 m2 x 2 floors x 6 m (height) = 720,000 m3
Inner streets (43,160 m2 ) x 6 m (height) = 258,960 m3
EER(Energy Efficiency Ratio)=cooling capacity of ac/power consumed by AC cooling capacity of 1 ton is equal to 3.517 kW of power.
For the AC electricity consumption for the inner streets around each building, add 211 Kwh/ day (77,000 Kwh annually added to the electricity consumption for each building)
To compare the total energy transmittance/heat transfer under the daytime condition in full sun of all glass types, based on a set of standard conditions formulated by ASHRAE
Solar intensity of 230 Btu/Hr/sqft
Outdoor/Indoor temperature difference of 14°F
RHG (btu/Hr/sqft) = ( SC x 230 ) + ( U-Summer x 14 )
RHG ( W/m2) = ( SC x 630) + ( U-Summer x 7.8 )
For the electrical part: Assume consuming the restaurants 9.3 Kwh/ m2 or 100 Kwh/ ft2 annually.
This means each building in the mall will consume 6,460,000 kwh annually +77,000 Kwh = (6,537,000 Kwh). for the 20 buildings = 130,740,000 Kwh.
The cinema building might consume 17,000,000 Kwh annually as there will be 3d projection mapping on the facade of the building.
The hotel building might consume 20,000 Kwh / room annually. This means the annual consumption might reach 44,000,000 Kwh, in addition to the exterior light for the ads on the side facade of the building and the 3d projection mapping (1,000,000 Kwh). So, the total will be 45,000,000 Kwh annually without the pools and jacuzzies.
I need also some calculations of the following to be considered in using geothermal energy (check the form in the attachments):
Energy load:
Heating:
Total Peak Load:
Annual Equivalent Full Load Hours:
Annual Heating Load:
Domestic Hot Water (if provided by heat pump):
Total Peak Load for Domestic Hot Water (DHW): Annual Domestic Load for Hot Water:
Cooling (if required):
Total Peak Load:
Annual Equivalent Full Load Hours:
Annual Cooling Load:
Active Or Passive Cooling?
Heat Pump (if known)
System Type:
If Hybrid – Secondary Equipment/System:
Total Capacity of Heat Pump (Heating):
Total Capacity of Heat Pump (Cooling):
Estimated COP (Heating): Estimated COP (Cooling):
I created the Revit model for the structure and have some of the Revit families for the plumbing elements, which I will provide via the chat.
So I need the following:
1. MEPF Designs (HVAC/Fire Protection/Plumbing) on Revit
2. 3D HVAC, Plumbing model on Revit + CFD
3. Hydraulic Calculations
4. HVAC Load Computations
5. Energy Analysis
6. Solar design (I have the calculation)
7. Duct Design
8. 4D information modeling using Navisworks + Clash detection
i will use the HPA software for your load calculations and also include your refered calculations.
i will then make zones in autocad and will provide an optimal HVAC solution that best suits your requirements.
i have a previous experience of deaigning HVAC systems too.
السلام عليكم
Hello
I'm Mohamed Saeed. mechanical engineer with high experience in HVAC, plumbing ,etc.
I have checked your job description and I'm ready to help you
Professional engineer with 40 years of experience in design and development of HVAC and fluid flow systems
Relevant Skills and Experience
Please attach full details
Hi Im a Mechanical Engineer who works as a design engineer for MEP sections of the high rise buildings. I do designing works for fire systems, plumbing systems, HVAC systems, Electrical systems, ventilation systems and all mechanical services. Let the professionals deal with this. Thanks
Hi, i have team of engineers with extensive experience in thermal system design and analysis. I have recently worked on zero energy building and conventional building thermal analysis which included roof,floor and walls design and analysis. I have also done multiple projects related to HVAC for freelancer clients. Kindly visit portfolio and provide more details in chat.
hello
how are you?
i am very interested in your project
i have read your description very carefully
I can do your job
i have great experiences in python
hope to hear from you
Hello,
I'd like to apply to your job "CFD". I have hands-on experience in civil engineering field, performing advanced CFD analysis using mostly Ansys Fluent, Star CCM+ and other codes. A number of different assignments and engineering experience including Offshore Engineering, Wave and Tidal Energy, Waste to Energy, HVAC, Auto Motive, Infrastructure, Process and Food Industry.
I hold a Master's Degree in Engineering Physics and I finished my Ph.D in Combustion Physics at Lund University.
Varying with the knowledge in different trades such ad CFD/FEA analysis by using Ansys software and other pre/post processing tools:
• ANSYS (FLUENT, MECHANICAL, AIM, SpaceClaim), STAR CCM+, ParticleWorks, ANSA ...
• Programming skills: Fortran 90/95, 70, MATLAB, C
• Multiphase Gas/Liquid, Solid/Gas Reaction Kinetics Modelling
Dedicated engineer, that understand deadlines and provides a high quality of work. I look forward to applying my skills and experience to your projects.
Best Regards, Fikret Saric
Hi dear, i have good experience in solar design engineering. I can do energy analysis and solar design from the list. Please ping me inbox so we can discuss further and i can start on it. Thanks
I am an electrical engineer, MSC in applied mathematics, MSC in power systems, PHD. Control and automation.
I can make your problem at any level, within my proposal, I can offer you additional extras. with 23 years of experience.
I can make your proposal with all the details you need. I can improve your proposal, with a mutual agreement.
I have worked as heads of automation engineers, processes in several machine design management companies and industrial production plants.
other forms of optimization, improving the manufacturing process, etc., we can discuss the details of your needs in the chat.
I have already done this type of analysis for this application the matlab, labview, and others.
I am interested in your project
I can do your project
Atte.
ING. Luis Moreno
Hello,
I have a doctorate from the design of heat exchangers (thermal-hydraulic, strength and vibration-fatigue). I have been dealing with heat exchangers and heat exchange, pressure vessels, pumps for 10 years. If you would like to know more specific information, let me know.
Hi,
I'm a CFD Engineer. I can do the basement CAR park and room air conditioning CFD analysis.
I have a wide experience Car park and room air conditioning analysis. if it is okay for you, I can do the CFD analysis.
if it is okay. please feel free to contact me.
Here a person with Masters from Thermal engineering. I can perform Heat load calculations in E20 format and HAP software with accurate. Having knowledge in Selection of HVAC equipment and concerned electrical calculations for the given project. Sound knowledge in AutoCAD updated version and Ducting design according to SMACNA standards. Familiar with ASHRAE codes and design of clean rooms from class 100 to 100000.
Design of construction, testing and commissioning of HVAC systems including:
Preparation of design phases issues such as design concept, schematic and tender documents including calculations and drawings.
Preparation of Construction documents comprising Drawings, Technical
Specifications and Bill of Quantities.
Load Calculation
Technical Evaluation of Bids, and issuing recommendation Reports.
Review and approval of project submittals.
Preparation of shop drawings and full construction details.
Supervision of construction works at job site.
I am experienced hvac design engineer
working in kuwait.
I Can provide you with all the hvac solutions you have asked for. But i have some doubts regarding your detailed HVAC description.
I would like to know whrather you need load calculation only for compleate part.
Bexause normally in cinema building we provide load for each screens and also for common area.
do you have same number of screens in each floor?
load depends upon many factors like people, area, types of wall, orientatiom l, electric load etc.
Also i have some other queries.
its better to have personal chat or call.
If you can arrange a call or chat please let me knw.
THANK YOU!
Professional Mechanical Engineer experienced over 5 years in Design, Supervision, and installation of HVAC, Fire Protection, and Plumbing Systems for various projects sizes. Completed 11 projects between Lebanon and Nigeria.